Tools / Materials list :
Power Drill 1 / 8 " Cable Cutter Two 3 / 8 " open end wrenches 3 / 16 " Allen Wrench 5 / 16 " Twist Bit 5 / 8 " x 3 " Flare Spade Bit 9 / 16 " wrench
Tape Measure Construction Adhesive Wax paper 1½ " Wood Screws ½ " Wood Plugs Cable Release Tool Safety Glasses
|
Optional Items : 3 / 16 " Hex Bit Socket 6 " -8 " piece of PVC tube Paraffin Wax LJ-3085 Insert-Runner |
Centerline |
Level Down Newel |
2 ¼ " |
Place and Mount the Rake Newels :
Refer to the above table for placement of newels . We recommend using our LJ-3004-3.5 Newel Mounting Kit to mount each newel post .
To ensure performance of our system , a stabilizing member such as our 3 / 4 " hollow stainless steel tube or S4S wood is required between all newel posts at the top predrilled position .
|
Rake Up Newel
A
|
2 ¼ " |
B |
Centerline |
1 . Mark the placement of the Newels on the rake centerline . The face of the Rake Up Newel must be exactly 2 1 / 4 " from the front edge of the bottom tread ( A ). The face of Level Down Newel on the landing at the top of the each flight must be exactly 2 1 / 4 " from the front edge of the landing tread ( B ).
2 . Follow the LJ-3004-3.5 Newel Mounting Kit instructions to drive the steel insert into the treads and install the hanger bolt into each newel ( C ).
|
Rake Up Newel |
Installer Bolt
Installer Nuts
Steel Insert
Tread
Stabilizing Member to be installed here
|
C |
Level Down Newel
Newel
Hanger Bolt
Installer Nuts
|
3 . We recommend installing at least the top and bottom rake cable fittings into the Rake Up Newel & Level Down Newel to avoid obstructions ( stabilizing member between newels / second tread ) while using the articulating portion of the fitting as a lever to rotate the lag into the newel face ( D ). See Installing Rake Cable Rail Fittings section of these instructions . |
Install Top and Bottom Cable Fittings before mounting newel posts |
Newel |
Hanger Bolt |
Tread |
4 . Mount each newel by threading the newel hanger bolt into the steel insert on the tread ( E ). Placing wax paper under the newel may help prevent marring the tread as the newel is tightened down . Trim away the excess wax paper once the position of the newel is permanently set .
5 . The distance between the Rake Up Newel and Level Down Newel should not exceed 42 ". If the distance is greater than 42 ", a Rake Pass Through Newel must be installed at 42 " maximum intervals between the mounted newels ( F ). Mount each Rake Pass Through Newel on the centerline making sure the face of the newel is exactly 2 1 / 4 " from the front edge of the tread .
|
Rake Up Newel |
D |
Rake Pass Through Newel
42 " Maximum 42 " Maximum
F
|
Level Down Newel |
E |
Steel Insert |